You must be a CVU Member to view this resource.
Sky Village
Building
Competition Entry
Residential / Office
All-Steel
126 m / 413 ft
29
3
4
41,000 m² / 441,320 ft²
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development