You must be a CVU Member to view this resource.
The Prestige at Pinnacle One Yonge
One Yonge Street Tower 1
Building
Completed
2022
Residential
All-Concrete
216.2 m / 709 ft
65
5
497
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
21 February 2020
A new supertall skyscraper in Toronto will be significantly shorter than the 553-meter-tall CN Tower once complete, but still greatly change the city's skyline. Hariri...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development