You must be a CVU Member to view this resource.
UŠĆE Office Tower 1
USCE Business Center 1
Building
Completed
1965
Office
All-Concrete
105.2 m / 345 ft
26
2
8
20,500 m² / 220,660 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
Recladding
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
14 February 2020
Located along the confluence of the Sava and Danube rivers, a new luxury skyscraper is being built next to the historic Ušće Tower, one of...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development