You must be a CVU Member to view this resource.
Petronas Twin Tower 1
Tower 1, Petronas Twin Tower Kuala Lumpur City Centre, Petronas Tower 1
Building
Completed
1998
Office
Concrete-Steel Composite
451.9 m / 1,483 ft
88
5
39
6 m/s
197,500 m² / 2,125,872 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
The Petronas Towers, located in Kuala Lumpur, were designed to herald the emergence of Malaysia into the global economy and act as an easily identifiable symbol for the fast-growing country.
The development’s scope, scale, and design reflect the desire to create a representative manifestation of local traditions and ingenuity. In particular, the design is based on Islamic geometry, a reflection of Malaysia’s cultural heritage. The buildings are perhaps most noteworthy for the skybridge that connects them on the 41st and 42nd floors. Although there is no structural benefit to the connection, it offers more than just an architectural flourish. By linking the two buildings together, the facilities of each tower around that level can be shared, including a conference room, prayer room, and executive dining room. Additionally, the skybridge is an integral part of the towers’ fire evacuation strategy.
Due to budgetary constraints, the development timeline of Petronas Towers was constrained to six years, an ambitious feat considering that the original expected construction time for the project was eight years. To speed things along, two construction consortiums were hired, each being responsible for building one of the towers. Naturally, incentives were established that rewarded the first team to the top with the rights to build the skybridge, resulting in a race between the Japanese and South Korean consortiums. Ultimately, Tower 2 was the first to reach its pinnacle, with the South Korean crew claiming victory.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development