You must be a CVU Member to view this resource.
Merdeka 118
Heritage of Independence, Park Hyatt Kuala Lumpur, KL118 Tower, Menara Warisan Merdeka, PNB Headquarters, Merdeka PNB118
Building
Completed
2023
Hotel / Serviced Apartments / Office
Concrete-Steel Composite
GBI Platinum targeted, GreenRE Platinum targeted, LEED Platinum BD+C: Core and Shell
678.9 m / 2,227 ft
118
5
30
202
87
10 m/s
292,000 m² / 3,143,062 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The Peer Review Engineer traditionally comments on the information produced by another party, and to render second opinions, but not to initiate what the design looks like from the start.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The Peer Review Engineer traditionally comments on the information produced by another party, and to render second opinions, but not to initiate what the design looks like from the start.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
2024 CVU Awards
2025 CVU Awards
2025 CVU Awards
08 June 2021
Permodalan Nasional Bhd’s (PNB) Merdeka 118 tower has safely topped out with the completion of the final roof slab after reaching its peak at level...
At a height of 678.9 meters, the structure comprises a dual lateral load-resisting system consisting of the concrete walls of the services core coupled by outrigger trusses to the perimeter bracing of mega-columns, sloping columns, and belt trusses. The mega-columns and core walls in this building are reinforced concrete without embedded structural steel, except within the depth of the outrigger truss. This creative engineering reduced imported steel costs and the number of trades, coordination, and construction time needed.
2024 CVU Awards
2025 CVU Awards
2025 CVU Awards
08 June 2021
Permodalan Nasional Bhd’s (PNB) Merdeka 118 tower has safely topped out with the completion of the final roof slab after reaching its peak at level...
08 May 2020
Construction work at Permodalan Nasional Bhd’s (PNB) Merdeka 118 has been delayed by roughly two to three months due to restrictive measures taken to curb...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development