|
RANK
|
Name
|
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Proposed Vision Never Completed Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Height
|
|---|---|---|---|
| 1 | Claridge Icon | 143 m / 469 ft | |
| 2 | Place de Ville III | 112 m / 367 ft | |
| 3 | Minto Metropole | 108 m / 354 ft | |
| 4 | Le Parc | 104 m / 341 ft | |
| 5 | R.H. Coats Building | 99 m / 325 ft | |
| 6 | Ottawa Marriott Hotel | 96.3 m / 316 ft | |
| 7 | Envie | 96 m / 315 ft | |
| 8 | Delta Ottawa City Centre | 96 m / 315 ft | |
| 9 | Place Bell Canada | 94 m / 308 ft | |
| 10 | Parliament of Canada, Parliament Hill Centre Block | 92.2 m / 302 ft |
Not enough data. Please change your search criteria.
|
Logo
|
Name
|
Level
|
# of 150m+ buildings
|
|
|---|---|---|---|---|
![]() |
Thornton Tomasetti, Inc. |
Platinum
|
233 | CIV • STRC • URB • ARCH • ENVE • PMNG • COMP • ENGM • ENGO • FAC • FACS • FIRE • GEO • HIST • INSU • MEP • SEC • SEIS • TRAN |
![]() |
Gradient Wind Engineering Inc. |
Silver
|
188 | WIND |
10 February 2022
High Levels of Carbon Monoxide Forces Evacuation of High-Rise building in Ottawa
A high-rise building in Overbrook was evacuated due to high levels of carbon monoxide on Sunday, 6 February, 2022, because the building's furnace heater on...
06 January 2022
An Ottawa Shopping Mall Could add Purpose-Built Rentals
Ottawa could put homes above its famous downtown shopping mall, the CF Rideau Centre. Last week, Cadillac Fairview (CF) announced it has submitted an application...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development