CVU Gold Member

DCI Engineers

About

Member Since: 2014

Member Offices: Seattle

Website: http://www.dci-engineers.com/

Mark D’Amato and Guy Conversano founded DCI in 1988, beginning the adventure out of one of their basements. From the start, they were committed to creating the kind of environment that would enable employees to thrive and make clients want to come back. That same tradition of commitment to our clients and employees alike continues to fuel the leadership of today.

DCI has long been on the leading edge when it comes to industry technology, but for us, technology is more than just new gadgets: it’s combining the promise of these new tools with our history of innovative ideas to save our clients money.

DCI is based in Seattle, with offices in Spokane, Portland, San Diego, Austin, Irvine, San Francisco, and Anchorage. We are licensed in all 50 states and most Canadian provinces.

Fields of Expertise

Seismic Design; Structural Engineering

Buildings

Please note that all heights shown in italics/red are estimated heights. These have been calculated based on known floor counts for the building, then extrapolated through analyzing typically hundreds of buildings of the same function on this database that do have confirmed heights. The user should be aware that non-standard building features, such as significant spires or raised entrances / podiums, may affect the accuracy of these estimations.

RANK
Name
Status

Completed

Architecturally Topped Out

Structurally Topped Out

Under Construction

On Hold

Proposed

Vision

Never Completed

Demolished

Competition Entry

Canceled

Proposed Renovation

Under Renovation

Renovated

Under Demolition

Height
1 The Independent
211.4 m / 694  ft
2 ELEV8 Office
182.9 m / 600  ft
3 Madison Centre
170.7 m / 560  ft
4 The Grand by Gehry
155.7 m / 511  ft
5 1918 8th Avenue
152.4 m / 500  ft
6 ELEV8 Apartments
140.2 m / 460  ft
7 ELEV8 Condominum
140.2 m / 460  ft
8 ELEV8 Hotel
140.2 m / 460  ft
9 1800 Terry
134.1 m / 440  ft
10 The 8 Tower
132.3 m / 434  ft

Awards

The Independent

Award of Excellence: The Independent

Best Tall Building, by Function, Residential or Hotel 2022

CVU Leaders

Kristopher Swanson

Kristopher Swanson

CVU Texas Chapter, 2023 – Present

Austin

Roger Heeringa

Roger Heeringa

CVU Regional Hub, Americas Steering Committee, 2025 – Present

Seattle

Building Completions Timeline

Global News

14 July 2023

First High-Rise on Treasure Island Topped Off

On July 11th, a steel beam was added to "top off" the first high-rise to be built on Treasure Island. The 22-story tower, Tidal House,...

 

12 June 2023

Mass Timber Tower Rising in Oakland

Construction is underway in Oakland for a first-of-its-kind high rise apartment building that could be among the tallest beamless mass plywood panel structure in the...

 

02 November 2022

Mass Timber Luxury Residential Development Proposed for Spokane

atelierjones led an integrated design team for the proposal of a 178,000-square-foot (16,536-square-meter) mass timber housing project in Spokane, Washington that would deliver both market...

View all

Please note that all heights shown in italics/red are estimated heights. These have been calculated based on known floor counts for the building, then extrapolated through analyzing typically hundreds of buildings of the same function on this database that do have confirmed heights. The user should be aware that non-standard building features, such as significant spires or raised entrances / podiums, may affect the accuracy of these estimations.

RANK
Name
Height
1 The Independent

211 m / 694 ft

2 ELEV8 Office

183 m / 600 ft

3 Madison Centre

171 m / 560 ft

4 The Grand by Gehry

156 m / 511 ft

5 1918 8th Avenue

152 m / 500 ft

6 ELEV8 Apartments

140 m / 460 ft

6 ELEV8 Condominum

140 m / 460 ft

8 ELEV8 Hotel

140 m / 460 ft

9 1800 Terry

134 m / 440 ft

10 The 8 Tower

132 m / 434 ft

11 Fifteen Fifty

129 m / 422 ft

12 1500 Mission Street

121 m / 396 ft

13 The Artise

111 m / 363 ft

14 Ovation East Tower

105 m / 345 ft

14 Ovation West Tower

105 m / 345 ft

16 Cielo

102 m / 335 ft

17 Conrad Los Angeles

99 m / 326 ft

18 Waterloo Tower

98 m / 320 ft

19 InterContinental Seattle Bellevue

93 m / 306 ft

20 MIRO East Tower

91 m / 298 ft

20 MIRO West Tower

91 m / 298 ft

22 The Hub

89 m / 292 ft

23 The Residences at Avenue Bellevue

87 m / 286 ft

24 Isle House

75 m

246 ft

Please note that this height is estimated, based on a floor count of 22 floors. The estimation has been arrived at by analyzing 9,733 other buildings of the same Residential function on this database that do have confirmed heights. The user should be aware that non-standard features, such as significant spires or raised entrances / podiums, may affect the accuracy of this estimation.
25 San Francisco Planning, Building and Public Works Departments

73 m / 238 ft

26 818 Stewart

67 m / 220 ft

27 701 Church

67 m / 220 ft

28 ANDYS at 1510 Webster Street

65 m

213 ft

Please note that this height is estimated, based on a floor count of 19 floors. The estimation has been arrived at by analyzing 9,733 other buildings of the same Residential function on this database that do have confirmed heights. The user should be aware that non-standard features, such as significant spires or raised entrances / podiums, may affect the accuracy of this estimation.
29 Four50

57 m / 187 ft

30 Residence Inn Grand Rapids

49 m / 162 ft

31 Emmons on 3rd

26 m / 86 ft

32 Heartwood

25 m / 83 ft

33 India & Beech

-

34 259 West Riverside Avenue

-

Statistics

Average Building Age*

8 Years

Most Common Function*

Mixed-use (50%)

Most Common Material*

Concrete (67%)

* Based on 150 m+ buildings currently in the database

Based on 4 buildings over 150 m height with a function
 
Based on 3 buildings over 150 m height with a material
 

Building Completions Timeline

Building Map

Construction Time Chart

NOTE: Construction start time is not available for all buildings. The average construction time is only displayed if there is three or more buildings with construction start and complete data in that year.

Designated Experts

CVU Leaders At DCI Engineers

CVU Texas Chapter, 2023 – Present

Kristopher Swanson

Principal, DCI Engineers

CVU Regional Hub, Americas Steering Committee, 2025 – Present

Roger Heeringa

14 July 2023

First High-Rise on Treasure Island Topped Off

On July 11th, a steel beam was added to "top off" the first high-rise to be built on Treasure Island. The 22-story tower, Tidal House,...

12 June 2023

Mass Timber Tower Rising in Oakland

Construction is underway in Oakland for a first-of-its-kind high rise apartment building that could be among the tallest beamless mass plywood panel structure in the...

02 November 2022

Mass Timber Luxury Residential Development Proposed for Spokane

atelierjones led an integrated design team for the proposal of a 178,000-square-foot (16,536-square-meter) mass timber housing project in Spokane, Washington that would deliver both market...

24 August 2022

Student Housing Tower Opens Ahead of Schedule in Austin

Waterloo Tower, the tallest new student-housing tower is now open. The building was delivered ahead of schedule and is already fully leased, according to a...

09 December 2019

Financial Backing Clears Way for High-Rise in San Diego

Parkview Financial announced it has provided a US$7 million loan to San Francisco-based India & Beech, LLC for the acquisition of a land parcel and...

13 February 2019

The Grand Development Breaks Ground in Los Angeles

Gehry Partners’ twin-towered The Grand development in Downtown Los Angeles broke ground on 12 February, 2019. The sizable mixed-use complex is to be located directly...

Learn more about the Council on Vertical Urbanism

Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development

Learn More